Electrical & Instrumentation – CTS Offshore and Marine Limited https://www.ctsom.com CTS Offshore and Marine Limited Fri, 19 Mar 2021 09:52:24 +0000 en-US hourly 1 https://wordpress.org/?v=5.7.17 https://www.ctsom.com/wp-content/uploads/2022/11/cropped-Asset-1-32x32.png Electrical & Instrumentation – CTS Offshore and Marine Limited https://www.ctsom.com 32 32 Vessel Returns to Service After Extensive Repairs https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/ https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/#respond Thu, 18 Mar 2021 12:11:57 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21473 CLIENT | PMSCs Service Provider VESSEL | Research Vessel DATE |October - November 2020 LOCATION | Stellendam, Netherlands  Overview The client contacted CTS to oversee the re-activation of their vessel. CTS was tasked with ensuring that the vessel’s technical compliance aligned with the [...]

The post Vessel Returns to Service After Extensive Repairs appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | PMSCs Service Provider

VESSEL | Research Vessel

DATE |October – November 2020

LOCATION | Stellendam, Netherlands 

Overview

The client contacted CTS to oversee the re-activation of their vessel. CTS was tasked with ensuring that the vessel’s technical compliance aligned with the port authority’s regulations and allowed for safe navigation. The vessel had been out of service for over a year, and neither the main engine nor any of the four
generators were running. It was no surprise that the vessel required an extensive amount of repair work.

Scope of Works

• Steel fabrication and installation
• Inspections and surveying
• Generator overhaul and repair
• Spares and equipment supply
• Electrical instrumentation

Project Gallery

Result

CTS oversaw the yard’s scope and provided the client daily reports on the repair process. CTS also brought in a team of specialists to resolve the electrical issues and fully repair the main engine and generators. Despite the significant amount of work required, with strong communication and thorough planning, CTS was able to deliver the project on schedule.

Client Feedback

“We appreciate the CTS’s flexibility and the team’s ability to manage the varying demands of the work scope.We look forward to working with them again on future projects.”

Managing Director

Download Case Study

Vessel Returns to Service after Extensive repairs

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Vessel Returns to Service After Extensive Repairs appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/feed/ 0
Engine Overhaul and Customization Restores Bulk Carrier https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/ https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/#respond Fri, 01 May 2020 10:51:21 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21070 CLIENT |Vessel Owner VESSEL | Bulk Carrier DATE | September 2019 LOCATION | Singapore Overview CTS was approached by the vessel owners to replace a damaged Yanmar 6EY22W engine onboard one of their bulk carriers. CTS, with their Yanmar specialist (twelve years of [...]

The post Engine Overhaul and Customization Restores Bulk Carrier appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT |Vessel Owner

VESSEL | Bulk Carrier

DATE | September 2019

LOCATION | Singapore

Overview

CTS was approached by the vessel owners to replace a damaged Yanmar 6EY22W engine onboard one of their bulk carriers. CTS, with their Yanmar specialist (twelve years of experience), compiled a six-man team to ensure that the overhaul went smoothly. The team was met with a challenge when it came to getting the new engine inside the engine room as the skylight was small, and the engine itself was over the safe working load limit of the vessel’s crane. There were also no lifting points or standard procedure to lift the engine. However, after careful planning, the team was able to come up with a tailor-made solution.

Scope of Works

CTS conducted a risk assessment for the necessary lifting works, and new strong points were welded in the engine room to facilitate the transfer of the engine and to mitigate the risk to a minimum. Despite the restricted entry space for the engine, the team was able to solve the issue by dismantling the engine in the CTS workshop and customizing it to fit the existing bedplate. CTS specialists also designed and fabricated a structure to lift the engine vertically so it could easily pass through the skylight. Once the engine was mounted on the bedplate and built up, the electrical system was modified and made compatible with the new engine. The engine was commissioned, and all trials carried out were witnessed by the class surveyor.

Project Gallery

Result

The job was complicated by the limited space of the engine room; however, the CTS service team was able to adapt and worked efficiently to complete the overhaul. The scope of work was completed within seven days. The client appreciated CTS’s professional and thorough approach and was satisfied with the team’s quality work.

Client Feedback

“The job was executed very safely and professionally. The team was experienced in their work. The engineer had an excellent knowledge of the engine.”

– Vessel Manager 

Download Case Study

Engine Overhaul and Customization Restores Bulk Carrier

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Engine Overhaul and Customization Restores Bulk Carrier appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/feed/ 0
CTS Teams Excel in Major Cruise Refit https://www.ctsom.com/case-studies/cts-teams-excel-in-major-cruise-refit/ https://www.ctsom.com/case-studies/cts-teams-excel-in-major-cruise-refit/#respond Thu, 26 Mar 2020 18:27:53 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=20973 CLIENT | Columbia Cruise Services VESSEL | Passenger Ship DATE | January-March 2020 LOCATION | Rijeka, Croatia Overview Columbia Cruise Services reached out to CTS to undertake various projects on-board their ship, the Marella Dream, in preparation for its 7th Class Renewal Survey. [...]

The post CTS Teams Excel in Major Cruise Refit appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Columbia Cruise Services

VESSEL | Passenger Ship

DATE | January-March 2020

LOCATION | Rijeka, Croatia

Overview

Columbia Cruise Services reached out to CTS to undertake various
projects on-board their ship, the Marella Dream, in preparation
for its 7th Class Renewal Survey. CTS assembled a team of 59
technicians with a wide range of specializations to fulfill the large
scope of projects over the course of 2 months. Our experience in
major turnkey EPC projects enabled us to implement a strategy to
complete the full extent of work on time while meeting our high
standard for quality.

Scope of Works

• Turnkey Installation of Alfa Laval Ballast Water Treatment Plant

• Steel Renewal works: tank repair & stiffener installation

• Kronhe flow meter installation

• Tank cleaning

• Window replacement with Rope access team

• Cosmetic renewal on funnel & sun deck

• Carpentry and upholstery team for passenger area refurbishment

• Electricians

Project Gallery

Result

Due to the age of the ship, there was a significant amount of steelwork required. Additionally, since numerous modifications had been carried out over the lifetime of the vessel, the drawings provided were no longer accurate. Fortunately, our team conducted a pre-evaluation to get a sense of these potential obstacles early on.

CTS worked closely with the owners to avoid any delays and was able to complete the project safely and on schedule. Columbia Cruise Services was impressed by our team’s expertise and requested for CTS to assist with future projects.

Client Feedback

“I want to commend CTS’s team for their exceptional work. Their team was responsive and adaptable when it came to completing all planned and unplanned tasks. I would recommend CTS Offshore and Marine’s services to others. We look forward to working with them on future projects.”

Technical Superintendent

Download Case Study

CTS Teams Excel in Major Cruise Refit

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post CTS Teams Excel in Major Cruise Refit appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/cts-teams-excel-in-major-cruise-refit/feed/ 0
3-D Scanning & Installation of BWTS Completed with Zero Downtime https://www.ctsom.com/case-studies/3-d-scanning-installation-bwts-completed-zero-downtime/ https://www.ctsom.com/case-studies/3-d-scanning-installation-bwts-completed-zero-downtime/#respond Tue, 11 Feb 2020 13:13:53 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=20565 CLIENT | Shipping & Maritime Group VESSEL | Container Ship DATE | Oct-Nov 2019 LOCATION | From Europe to the U.S. Overview CTS was contacted by a shipping and maritime group to fabricate and install a BWT system for one of their container ships. A [...]

The post 3-D Scanning & Installation of BWTS Completed with Zero Downtime appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Shipping & Maritime Group

VESSEL | Container Ship

DATE | Oct-Nov 2019

LOCATION | From Europe to the U.S.

Overview

CTS was contacted by a shipping and maritime group to fabricate and install a BWT system for one of their container ships. A 9 person team of skilled fitters and electricians were dispatched to carry out the piping installations and cabling work on board during the vessel’s voyage to prevent downtime. A 3-D scan was taken of the space allocated to the BWT system and a model was prepared to evaluate the current layout of the area in order to design the BWTS. The pipes were prefabricated, and hot dip galvanized as a longlasting, cost-effective solution to help prevent corrosion.

Scope of Works

  •  3-D Scanning, design and engineering
  •  Prefabrication and fitting of piping foundation and supports
  • Supply of cables and installation of electrical works
  • Installation of Alfa Laval PureBallast Compact Type 600 Flex

Project Gallery

Result

The CTS team finished the scope of works over the span of 25 days, all work was executed during the vessel’s route and completed without disrupting the journey. With regard to the intricate nature of the project, the client acknowledged CTS’s expertise and ability to provide practical solutions.

Client Feedback

“Excellent, surpassed expectations. The task was very well organized, the workers were very experienced and professional. High safety standards observed, would recommend for a future project.”

 Technical Superintendent

Download Case Study

3-D Scanning & Installation of BWTS Completed with Zero Downtime

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post 3-D Scanning & Installation of BWTS Completed with Zero Downtime appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/3-d-scanning-installation-bwts-completed-zero-downtime/feed/ 0
Multiple Projects Completed On Board Cruise Vessel https://www.ctsom.com/case-studies/multiple-projects-completed-board-cruise-vessel/ https://www.ctsom.com/case-studies/multiple-projects-completed-board-cruise-vessel/#respond Fri, 17 Jan 2020 11:05:08 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=20487 CLIENT | Columbia Cruise Services VESSEL | Cruise Vessel LOCATION | Cadiz, Spain DATE | Nov-Dec 2019 Overview A highly skilled team of 38 specialists were selected to complete a series of projects for Columbia Cruise Services’ passenger vessel. Columbia Cruise Services had a [...]

The post Multiple Projects Completed On Board Cruise Vessel appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Columbia Cruise Services

VESSEL | Cruise Vessel

LOCATION | Cadiz, Spain

DATE | Nov-Dec 2019

Overview

A highly skilled team of 38 specialists were selected to complete a series of projects for Columbia Cruise Services’ passenger vessel. Columbia Cruise Services had a wide range of work requests, therefore CTS prepared an extensive strategy in order to complete all the project tasks on time and to ensure that everything suited their needs. The team consisted of naval architects, class approved welders, electricians and tank cleaners. The CTS team spent a total of 23 days on board the dry-docked ship.

Scope of Works

  • Turnkey installation of Alfa Laval 3.1 Compact Flex BWTS including scanning, design and engineering works
  • Fuel oil tank cleaning
  • Funnel reinstatement
  • Low-level location lighting replaced for all passenger and crew areas

Project Gallery

Result

The project was completed successfully and on schedule despite the constraints of working within the confined space of the vessel and the lack of drawings available. The team also experienced a challenge when it came to integrating the ballast water treatment plant with the on-board automation system. However, through thorough planning and strong communication between parties, the job was finished with outstanding craftsmanship and exceeded the client’s expectations.

Client Feedback

“Excellent job. The crew was disciplined, professional and ensured that all the jobs were completed on time and up to standard. Quality work, we would recommend CTS Offshore and Marine for future projects.”

Technical Superintendent

Download Case Study

Multiple Projects Completed On-board Cruise Vessel

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS Offshore and Marine Limited:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Multiple Projects Completed On Board Cruise Vessel appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/multiple-projects-completed-board-cruise-vessel/feed/ 0
Complete upgradation for Serco machinery control & monitoring system https://www.ctsom.com/case-studies/complete-upgradation-machinery-control-monitoring-system/ https://www.ctsom.com/case-studies/complete-upgradation-machinery-control-monitoring-system/#respond Sun, 24 Jan 2016 13:00:10 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=19121 CLIENT | Serco VESSEL | Impetus/Impulse TUG DATE | January 2016 LOCATION | Scotland Project Brief Serco, an international service company, contracted CTS Offshore and Marine Limited to perform complete upgradation of their Machinery Control & Monitoring System. CTS conducted a thorough review of [...]

The post Complete upgradation for Serco machinery control & monitoring system appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Serco

VESSEL | Impetus/Impulse TUG

DATE | January 2016

LOCATION | Scotland

Project Brief

Serco, an international service company, contracted CTS Offshore and Marine Limited to perform complete upgradation of their Machinery Control & Monitoring System.

CTS conducted a thorough review of the vessels existing system and were able to provide client with recommendation of PRAXIS system, which not only was a reliable system but also in-line with the client fleet.

Scope of Work

Initial site survey was done to determine specific data of all monitoring and alarm signals. This data was sent to PRAXIS for custom building of the new modules. The solution was delivered on a turnkey basis with survey, custom-module production, installation and testing.

Results

The project was concluded safely despite challenges of an erratic functional system without proper availability of drawings with the vessel. We were able to also custom built the speed sensors for the client which makers were unable to give viable solutions. The work had to be carried out around the strict schedule of the tug’s duties with minimal downtime.

Client Feedback

Clients were very happy as the system was erratic and non-reliable for a long time and we were able to deliver custom solution for their needs IN-TIME and with ZERO incidents.

Download Case Study

Serco Machinery Control and Monitoring System Case Study

The post Complete upgradation for Serco machinery control & monitoring system appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/complete-upgradation-machinery-control-monitoring-system/feed/ 0