Generator Service & Repairs – CTS Offshore and Marine Limited https://www.ctsom.com CTS Offshore and Marine Limited Fri, 19 Mar 2021 09:52:24 +0000 en-US hourly 1 https://wordpress.org/?v=5.7.17 https://www.ctsom.com/wp-content/uploads/2022/11/cropped-Asset-1-32x32.png Generator Service & Repairs – CTS Offshore and Marine Limited https://www.ctsom.com 32 32 Vessel Returns to Service After Extensive Repairs https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/ https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/#respond Thu, 18 Mar 2021 12:11:57 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21473 CLIENT | PMSCs Service Provider VESSEL | Research Vessel DATE |October - November 2020 LOCATION | Stellendam, Netherlands  Overview The client contacted CTS to oversee the re-activation of their vessel. CTS was tasked with ensuring that the vessel’s technical compliance aligned with the [...]

The post Vessel Returns to Service After Extensive Repairs appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | PMSCs Service Provider

VESSEL | Research Vessel

DATE |October – November 2020

LOCATION | Stellendam, Netherlands 

Overview

The client contacted CTS to oversee the re-activation of their vessel. CTS was tasked with ensuring that the vessel’s technical compliance aligned with the port authority’s regulations and allowed for safe navigation. The vessel had been out of service for over a year, and neither the main engine nor any of the four
generators were running. It was no surprise that the vessel required an extensive amount of repair work.

Scope of Works

• Steel fabrication and installation
• Inspections and surveying
• Generator overhaul and repair
• Spares and equipment supply
• Electrical instrumentation

Project Gallery

Result

CTS oversaw the yard’s scope and provided the client daily reports on the repair process. CTS also brought in a team of specialists to resolve the electrical issues and fully repair the main engine and generators. Despite the significant amount of work required, with strong communication and thorough planning, CTS was able to deliver the project on schedule.

Client Feedback

“We appreciate the CTS’s flexibility and the team’s ability to manage the varying demands of the work scope.We look forward to working with them again on future projects.”

Managing Director

Download Case Study

Vessel Returns to Service after Extensive repairs

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Vessel Returns to Service After Extensive Repairs appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/feed/ 0
Engine Overhaul and Customization Restores Bulk Carrier https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/ https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/#respond Fri, 01 May 2020 10:51:21 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21070 CLIENT |Vessel Owner VESSEL | Bulk Carrier DATE | September 2019 LOCATION | Singapore Overview CTS was approached by the vessel owners to replace a damaged Yanmar 6EY22W engine onboard one of their bulk carriers. CTS, with their Yanmar specialist (twelve years of [...]

The post Engine Overhaul and Customization Restores Bulk Carrier appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT |Vessel Owner

VESSEL | Bulk Carrier

DATE | September 2019

LOCATION | Singapore

Overview

CTS was approached by the vessel owners to replace a damaged Yanmar 6EY22W engine onboard one of their bulk carriers. CTS, with their Yanmar specialist (twelve years of experience), compiled a six-man team to ensure that the overhaul went smoothly. The team was met with a challenge when it came to getting the new engine inside the engine room as the skylight was small, and the engine itself was over the safe working load limit of the vessel’s crane. There were also no lifting points or standard procedure to lift the engine. However, after careful planning, the team was able to come up with a tailor-made solution.

Scope of Works

CTS conducted a risk assessment for the necessary lifting works, and new strong points were welded in the engine room to facilitate the transfer of the engine and to mitigate the risk to a minimum. Despite the restricted entry space for the engine, the team was able to solve the issue by dismantling the engine in the CTS workshop and customizing it to fit the existing bedplate. CTS specialists also designed and fabricated a structure to lift the engine vertically so it could easily pass through the skylight. Once the engine was mounted on the bedplate and built up, the electrical system was modified and made compatible with the new engine. The engine was commissioned, and all trials carried out were witnessed by the class surveyor.

Project Gallery

Result

The job was complicated by the limited space of the engine room; however, the CTS service team was able to adapt and worked efficiently to complete the overhaul. The scope of work was completed within seven days. The client appreciated CTS’s professional and thorough approach and was satisfied with the team’s quality work.

Client Feedback

“The job was executed very safely and professionally. The team was experienced in their work. The engineer had an excellent knowledge of the engine.”

– Vessel Manager 

Download Case Study

Engine Overhaul and Customization Restores Bulk Carrier

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Engine Overhaul and Customization Restores Bulk Carrier appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/feed/ 0