Renewable Energy – CTS Offshore and Marine Limited https://www.ctsom.com CTS Offshore and Marine Limited Fri, 07 Oct 2022 13:41:55 +0000 en-US hourly 1 https://wordpress.org/?v=5.7.17 https://www.ctsom.com/wp-content/uploads/2022/11/cropped-Asset-1-32x32.png Renewable Energy – CTS Offshore and Marine Limited https://www.ctsom.com 32 32 Supply of Blasting & Coating skilled team with rope access certification https://www.ctsom.com/case-studies/supply-of-blasting-coating-skilled-team-with-rope-access-certification/ https://www.ctsom.com/case-studies/supply-of-blasting-coating-skilled-team-with-rope-access-certification/#respond Fri, 07 Oct 2022 12:09:49 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21611 CLIENT | Accommodation Vessel Owner ASSET | Accommodation Vessel DATE | 2022 LOCATION | Brazil Overview CTS was invited by the Accommodation Vessel Owner/operator to provide one Rope Accesswelding 6G team and two teams of R/A U.H.P. blasters & painters, for renewal of [...]

The post Supply of Blasting & Coating skilled team with rope access certification appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Accommodation Vessel Owner

ASSET | Accommodation Vessel

DATE | 2022

LOCATION | Brazil

Overview

CTS was invited by the Accommodation Vessel Owner/operator to provide one Rope Accesswelding 6G team and two teams of R/A U.H.P. blasters & painters, for renewal of braces on the PS and SBS crane boom under the supervision and instructions of the maker’s FavelleFavco. The R/A blasting and coating team was to descale the crane boom mechanically, clean chemically / U.H.P. W. Jet blasting, and then paint with 2 coats of primer and yellowtop coat. CTS provided all the R/A equipment, consumables, and equipment required for the blasting and coating teams. The team was handpicked from our pool of skilled ex-shipyard pipe and steel fitters/welders with very good knowledge and relevant certificates. Experienced Blasting/Coating teams were deployed for the project

Scope of Works

• Braces: Total renewal of 38 braces (26 on the port boom and 8 on the STBD boom)• De-scaling and painting booms with two stripe coats of primer paint and top yellow coat full paint apply on booms
• CTS along with the Client, ensured all areas of work had no presence of debris and oil.• All the passageways cleared from any obstacles for easy access.
• Hot work was minimized, and major cutting and welding were conducted only after approval from Safety inspector
• All electrical equipment checked by Client electrical and HSE department and lock out and tag out system was put into use

Project Gallery

Result

The project was delivered safely, within time and quality to the Client

Client Feedback

“The Client was extremely pleased and impressed with CTS quality of work and assured they would only use our services as and when required in the future.”

Download Case Study

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Supply of Blasting & Coating skilled team with rope access certification appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/supply-of-blasting-coating-skilled-team-with-rope-access-certification/feed/ 0
CTS completes customised EPC solution within time https://www.ctsom.com/case-studies/cts-completes-customised-epc-solution-within-time/ https://www.ctsom.com/case-studies/cts-completes-customised-epc-solution-within-time/#respond Fri, 07 Oct 2022 09:21:15 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21607 CLIENT | Oil Major ASSET | Jack up Rig DATE | 2022 LOCATION | Dubai Dry-Docks Overview Our Client called upon CTS to analyze and provide a solution for the HVAC issues faced on-board their jack-up rig. CTS provided expertise with certified personnel [...]

The post CTS completes customised EPC solution within time appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Oil Major

ASSET | Jack up Rig

DATE | 2022

LOCATION | Dubai Dry-Docks

Overview

Our Client called upon CTS to analyze and provide a solution for the HVAC issues faced on-board their jack-up rig. CTS provided expertise with certified personnel to give customised EPC solutions within Clients’ time frame.

The three main affected areas were:
• Transformer room: in peak summer in Arabian Gulf, the transformer room temperature was reaching higher than the stipulated operating conditions.
• Galley System: in peak summer, with outside temperature reaches 48C, the temperature inside the galley was affecting working conditions.
• PLC Room : Cooling was found insufficient upon inspection condenser was found with several damages to the condenser fins and areas rusted obstructing the optimum heat exchange

Scope of Works

• CTS provided new sea water cooled packaged AC unit and a new duct was connected to the transformer room. The transformer room temperature was brought down by 10 C.
• Condenser units were replaced in order to achieve sufficient cooling for the PLC. CTS provided CARRIER certified personnel and equipment to troubleshoot and conduct adjustments of parameters to achieve desired results.

Project Gallery

Result

The works were completed and tested to the satisfaction of the C/E well within time and in concurrence to the other SIMOPS shipyard works

Client Feedback

“The works were completed and tested to the satisfaction of the C/E well within time and in concurrence to the other ongoing shipyard works.”

Download Case Study

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post CTS completes customised EPC solution within time appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/cts-completes-customised-epc-solution-within-time/feed/ 0
Three Offshore Wind HVDC Platforms treated for Corrosion damage https://www.ctsom.com/case-studies/three-offshore-wind-hvdc-platforms-treated-for-corrosion-damage/ https://www.ctsom.com/case-studies/three-offshore-wind-hvdc-platforms-treated-for-corrosion-damage/#respond Fri, 07 Oct 2022 09:07:33 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21602 CLIENT | Transmission System Operator ASSET | HDVC Platform DATE |  2022 LOCATION | North Sea, Germany Overview CTS was called upon to provide painting and maintenance services for the top deck of three offshore wind HV transformer platforms located in the North Sea, off the coast of Germany.The [...]

The post Three Offshore Wind HVDC Platforms treated for Corrosion damage appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Transmission System Operator

ASSET | HDVC Platform

DATE |  2022

LOCATION | North Sea, Germany

Overview

CTS was called upon to provide painting and maintenance services for the top deck of three offshore wind HV transformer platforms located in the North Sea, off the coast of Germany.
The platforms were situated in a harsh corrosive environment and also had a heavy workload of container movements. The wear and tear caused by these severe conditions meant that these platforms had to undergo regular maintenance, including a new layer of protective coating and paint. It is, for this reason, the client, a major European electricity transmission system operator, entrusted CTS to conduct this task, safely, and in a cost-effective manner.

Scope of Works

• Climate control habitat set-up
• High-pressure washing (300 bar) conducted
• Steel thickness measurement
• Descaling
• Bresle testing
• Blasting, sanding for rust removal,
• Preparation of steel for paint
• Relative humidity and dewpoint inspection
• Painting and protective coating for the deck.
• Dry film thickness test

Project Gallery

Result

Despite the stringent travel measures due to the COVID-19 outbreak, CTS was quickly able to assemble a qualified team to complete the work on each platform within the two-month time frame. Each team built a climate-controlled habitat around the work area, to ensure the ideal conditions were maintained throughout the preparation and coating process. The Client was pleased with the CTS team’s competence and attention to detail.

Client Feedback

“We’d like to thank CTS and their team for a job well done. Effective project management and quick to mobilize even with the constraints of COVID-19. We are very pleased with the standard of work seen these last two months and the professionalism of the team on board.”

– Asset Manager

Download Case Study

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Three Offshore Wind HVDC Platforms treated for Corrosion damage appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/three-offshore-wind-hvdc-platforms-treated-for-corrosion-damage/feed/ 0